In Lithuania, newly connected Type C electricity generation modules (EGMs) with a total capacity of 5 MW to 15 MW must comply with grid code requirements, which are tested during trial operations in collaboration with the transmission system operator, AB Litgrid....
In the ever-evolving energy market, efficiency and adaptability are crucial for maintaining profitability, especially for renewable energy producers. Elseta’s WCC Lite, in conjunction with CloudIndustries’ advanced monitoring system, provides a smart solution...
As the demand for renewable energy continues to rise, the need for efficient and reliable energy management solutions becomes critical. Elseta’s WCC Lite, combined with CloudIndustries’ monitoring system, offers an innovative approach to battery management...
At Elseta, besides the manufacturing of our devices as the mini RTU, I/Os, etc., we have also created a solution for PV plant control based on the European Distribution Network Operators (DNOs) requirements. We have been doing this service with our WCC Lite starting...
IMPROVE MV NETWORK AVAILABILITY AND CONTROL Empower Your Substation with Advanced Automation and Reliable Protection. Flexible and open design 100% fit into customer requirements Overview The Elseta WCCLite RTU is a compact and cost-effective solution for medium...